Project-Based Outsourcing Model

  Phase:
  Activities:
  Deliverables:
Analysis/Requirements
• Gather requirements
• Scope the project
• Describe the old architecture
• Identify critical issues
• Project Proposal
• Requirements Document
• Project Plan
• System Architecture
Design Documents creation
• Develop System Design Schema
• Create detailed project plan
• Design Document
• Hardware and system architecture
• QA Plan
Development/Unit testing
• Modules coding
• Unit Testing
• System in overall development
• Test case development
• Test Plan
• Issue Tracking Log
• Code Walkthrough Review
• System Test Cases
System testing/Integration
• Test cases running
• Bug Fixing
• Change request review
• Update test cases
• Update Design Document
• Test Plan
• Test Cases
• Test Log sheet
• Approved Change Requests
• Updated Design Document
Acceptance/Release to Production
• Verify Acceptance criteria
• Bug Fixing
• Change Request review
• User Training
• Development of User Manuals
• Sign Off on Acceptance
• List of QA bugs
• User Manuals
• Installation/Release Notes
| More